In brief
Start with the two leases, because they set your dates. Then book the IT work and the removal survey. Before you leave, deal with waste, old electricals and data properly. After the move, cover fire safety, workstation checks and your registered address if it changes.
On this page
Most office move checklists you’ll find online are really packing lists. Packing matters, but it’s rarely what goes wrong. What catches people out is the stuff around the move: a lease date nobody checked, an internet line that isn’t live, a skip full of old computers that should never have gone in a skip.
This checklist is in the order you’ll need it. It’s written for UK businesses, with links to the official sources at the bottom.
Before you commit to a date
The date is usually set for you, not by you. So start with the paperwork that sets it.
- Your current lease. When does it end, and is there a break clause with a notice period? What does it say about the state you must leave the space in?
- Your new lease. When can you get access to fit out, and when does rent start?
- The overlap. If you can hold both offices for a week or two, the move gets far easier. No overlap means everything must happen in one go.
Once those dates are clear, you can work backwards. In a lot of cases that’s the moment people realise they have less time than they thought.
Three to six months out
This is where the longer jobs sit. You may find that the IT lead time is the thing that decides everything else.
- Order connectivity for the new office. Ask your provider how long a new line and any network work will take, and do it before you fix the move date.
- Plan the new layout. Count desks, meeting rooms and storage, and check power and network points at every desk position.
- Get removal quotes. Give two or three firms the same brief and ask for a survey. Our office removals guide covers what to ask.
- Decide what’s moving. Old furniture you won’t take still needs somewhere to go, and that affects both quotes.
- Read the dilapidations clauses. If the lease asks you to reinstate the space, that work has to fit before you hand back the keys.
The month before
Now it gets practical. It’s very important to name one person who owns the move. Without that, small jobs fall between teams.
- Confirm access at both buildings. Loading bays, goods lifts, permitted hours and any parking bay suspension.
- Book the clearance. Whoever takes your waste must be a registered waste carrier. Check their registration and keep the transfer note.
- Sort old electricals. Computers, screens and phones are WEEE and go to an authorised route, not general waste.
- Deal with data. Every device leaving for good should be wiped or destroyed, with a record. Our guide to disposing of old computers explains why.
- Tell people. Clients, suppliers, your bank, insurers and anyone who sends you post.
Move week
This is the part people picture when they think of a move, and it’s usually the most predictable.
| When | What happens |
|---|---|
| Early in the week | Crates arrive and staff pack their desks |
| The day before | Final backup, IT shut down and labelled |
| Move day | Crew dismantles, loads, moves and rebuilds desks |
| Straight after | IT reconnected and tested before staff arrive |
A lot of offices move across a weekend so nobody loses a working day. That costs more, so ask for a weekday price too.
After the move
The jobs here are easy to forget once everyone is unpacked. Some of them are legal duties, not nice-to-haves.
- Fire risk assessment. The responsible person for the new premises needs one, under the fire safety rules for England and Wales (Scotland has its own law).
- Workstation checks. Staff who use screens should have their new workstations assessed under the display screen equipment rules.
- Registered office. If your company’s registered address is changing, tell Companies House online or on form AD01.
- Hand back the old office. Clear it, carry out any agreed reinstatement, and photograph the condition on the day you leave.
Those photos sound like a small thing. If a dilapidations claim arrives months later, they may be the best evidence you have.
A worked example
Say you run a 20-desk office moving across town. Your lease ends on the last day of the month and the new one starts two weeks earlier, giving a fortnight’s overlap. You book the line and network work first, then ask three firms to survey. Our cost calculator puts a weekday move with desk IT and two weeks of crates at about £2,000 to £5,000 as a guide. Clearance of the old office is priced separately once you know what’s staying behind.
Want a removals firm to look at your list with you? Get a quote and we’ll find one that covers your move.
Where our information comes from
- File changes to a company with Companies House (GOV.UK)
- Workplace fire safety: your responsibilities (GOV.UK)
- Working safely with display screen equipment (HSE)
- Environmental Protection Act 1990, section 34 (legislation.gov.uk)
- Register as a waste carrier, broker or dealer in England (GOV.UK)
- The Waste Electrical and Electronic Equipment Regulations 2013 (legislation.gov.uk)
- The Dilapidations Protocol (Ministry of Justice)