What are dilapidations when you leave an office?

Leases Written by the Office Relocation Company team, . A 3-minute read.

An empty office floor before fit-out

In brief

Dilapidations are the repairs and reinstatement your lease asks for when you leave. If you don't do them, the landlord may claim the cost. In England and Wales, claims follow a court protocol. The law also limits what a landlord can recover for repairs.

On this page
  1. What the word means
  2. How a claim works
  3. What limits a landlord’s claim
  4. What to do before you move
  5. A worked example

If you’re leaving a leased office, you’ll probably hear the word dilapidations before long. A lot of tenants assume it means a bit of cleaning and touching up the paint. Sometimes it does. Sometimes it means a sizeable claim that arrives after you have already moved out.

This post explains what dilapidations are, how claims are made in England and Wales, and what you can do before the move to keep things under control. It’s general information, not legal advice, and Scotland works differently.

What the word means

Dilapidations are the breaches of your lease’s repair and reinstatement terms at the end of the tenancy. In plain terms, it’s the gap between the state the lease says you must leave the office in and the state you actually leave it in.

Most commercial leases include some mix of these:

  • Repair. Keeping the premises in repair, sometimes to a high standard.
  • Reinstatement. Removing alterations you made, such as partitions, kitchens or cabling, and putting the space back.
  • Redecoration. Redecorating in the last year of the term, or at the end.
  • Statutory compliance. Meeting legal requirements that the lease puts on the tenant.

What applies to you depends entirely on your lease wording. That’s why the first step is always to read it, ideally with a surveyor.

How a claim works

When a lease ends and the landlord thinks you haven’t met these terms, they usually serve a schedule of dilapidations. That’s a document listing each breach, the work needed and its cost.

In England and Wales, the court’s Dilapidations Protocol sets out how that claim should be made and answered before anyone goes to court. It expects the landlord to send a schedule and a quantified claim, the tenant to respond, and both sides to try to settle sensibly, often with surveyors meeting to narrow the issues.

Here is the usual shape of it:

Stage Who acts What happens
Lease ends Both Keys handed back; condition recorded
Schedule served Landlord Breaches and costs set out
Response Tenant Each item agreed, disputed or priced differently
Negotiation Both Surveyors meet; most claims settle here

Most claims never reach a court. They settle through negotiation once both sides have their surveyors’ views.

What limits a landlord’s claim

You might think a landlord can simply bill you for every item on the schedule. It isn’t that simple. Under section 18(1) of the Landlord and Tenant Act 1927, damages for a breach of a repairing covenant can’t exceed the amount by which the value of the landlord’s interest has gone down because of the disrepair.

In other words, if the landlord plans to strip the office out and refurbish it anyway, some repairs may make little or no difference to the value of the building. That can reduce what they can recover. But again, it will depend on the facts, and this is exactly where a surveyor earns their fee.

What to do before you move

The best time to deal with dilapidations is before the lease ends, not after the schedule arrives.

  • Read the lease early. Find the repair, reinstatement and decoration clauses, and any licences for alterations you made.
  • Get advice. A chartered surveyor can tell you what the likely liability is. RICS publishes guidance on dilapidations for tenants and landlords.
  • Decide: do the work or pay. Sometimes doing the reinstatement yourself before you leave is cheaper. Sometimes agreeing a payment is easier. Talk to the landlord.
  • Plan the strip-out with your move. If partitions or fittings must come out, build that into the clearance timetable.
  • Record the condition. Take dated photos and video of every room on the day you hand back the keys.

In older buildings, removing partitions or ceilings can disturb asbestos. The person responsible for managing asbestos in the building should be able to tell you where it is before any strip-out starts.

A worked example

Say your lease asks you to remove the glass meeting rooms you added five years ago. You get a price for the strip-out and fold it into the move: the removals firm moves your desks on Saturday, and a contractor removes the partitions in the week after. You photograph the empty floor and hand back the keys. When the landlord’s schedule arrives, the reinstatement item is already done, and you have the evidence.

If your move includes a strip-out or a big clearance, get a quote and we’ll find a firm that can handle both.

Where our information comes from

Tell us about the move

We find an office removals firm that works where you are moving and give you their name before any of your details go to them. It costs you nothing.

  1. You tell us where you are, what is moving and when.
  2. We look for a removals firm that covers the move and tell you who they are.
  3. Only if you agree do they get your details, survey the office and quote in writing.
Step 1 of 3
Where is the office now?
Get a quote